  
 |
| action policy |
Necessity and development of small-scale
efficient technology |
The generating scale (collectable quantity) of the biomass in Japan
is 10t of numbers from several t.
It is a problem of the utmost importance
how little of this biomass is efficiently changed into energy.
|
The increase in biomass deposits and reservation of biomass royalties by establishment of domestic technology |
Deposits and royalties.
If the biomass is likened with crude oil and considered,
by developing a small-scale energy-ized process,
the resources which were not able to be used
until now can also be used now,that is,deposits will increase.
The royalties by offer of a development plant of
having resources/emissions rights (*1)
transferred with the priority to Japan are secured by providing a country
without that technology with this developed small-scale efficient technology.
※1 The emissions rights of a carbon dioxide can be transferred in the Kyoto
Protocol.
When the carbon dioxides more than the quantity at
which the foreign country is appointed are reducible
or when the amount of reduction of a carbon dioxide increases sharply with
the technology of a foreign country,
I have the right to emit a carbon dioxide of the country transferred.
Suppose that it was reducible of the place of 8% of reduction target to
10%with technology of Japan.
The thing of clearing by the emissions rights which I had transfer the
2% and were transferred from the foreign country 2% of 6% of a reduction
target of Japan since many 2% . |
|
|
| |
Manager:Yukihiko Mastumura. Biomass Project Research Center, Hiroshima
University
C/o Mechanical System Engineering Department,
Thermal Energy Laboratory 1-4-1 Kagamiyama,
Higashi-hiroshimahshi, Hiroshima 739-8527
JAPAN
Tel : 0824-24-7561 Fax : 0824-22-7193
Mail :sayaka38@hiroshima-u.ac.jp
since 16oct2003copyright(C) biomass project
research center, Hiroshima Univ. All rights
reserved.
|
|
Biomass Project Research Center is a center
to study biomass utilization located
in Hiroshima University.
We focus on technology development
and system engineering
on biomass utilization
and collaborate with the industry
and government sectors
to introduce biomass.
count start since 2008・ 5・26
|
| the greeting from centerlength |
A biomass project research center
will be established
by the intramural measure
in Hiroshima University lately.
I think that he wants
to cooperate also
with the National Institute
of Advanced Industrial Science
and Technology China center,
China economy industrial office,
and the industrial world,
and to advance research
of the biomass.
I want to advance joint research
with an area,
and information interchange
with the world simultaneously
when it comes to the saucer
of the biomass relation
of Hiroshima University.
I need your help well pleasing
2008・ 5・26
Biomass project
research center length :
Naomichi Nisio
Manager : Matsumura Yukihiko
|
|