L-band RF Gun
R&D
Group
|
KEK
Osaka
University
Hiroshima
University
|
|
37th Meeting (24 January 2012)
1. Status of Cavity
Fabrication
|
G. Isoyama
|
PDF
|
2. STF Schedule
|
H. Hayano
|
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
36th Meeting(20 December 2011)
1. Status of Cavity
Fabrication
|
K.Kawase
|
PDF
|
2. STF Schedule
|
H. Hayano
|
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
35th Meeting(15 November 2011)
1. Status of Cavity
Fabrication
|
K.Kawase
|
PDF
|
2. A Proposal for Cooling
Channel Modification of the Cavity
|
G. Isoyama
|
PDF
|
3. Summary of Cavity
Processing
|
A. Kuramoto
|
PDF
|
4. STF Schedule
|
H. Hayano
|
XLSX
|
5. Minutes
|
M. Kuriki
|
DOC
|
|
34th Meeting(11 October 2011)
1. Status of Cavity
Fabrication
|
K. Kawase
|
PDF
|
2. Status of Cavity
Processing
|
M. Kuriki
|
PDF
|
3. STF Schedule
|
H. Hayano
|
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
33rd Meeting(12 Semptember 2011)
1. Status of Cavity
Fabrication
|
G. Isoyama
|
PDF
|
2. RF Cavity Tuning
|
K. Kawase
|
PDF
|
3. RF Processing History
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
32nd Meeting(22 July 2011)
1. Status of Cavity
Fabrication
|
K. Kawase
|
PDF
|
2. Cs2Te Cathode
Evaporation Test
|
Y. Masumoto
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
31st Meeting(21 June 2011)
1. Staus of Cavity
Fabrication
|
G. Isoyama
|
PDF
|
2. Cs2Te cathode QE
Measurement System
|
S. Hosoda
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
30th Meeting(10 May 2011)
1. Status of Cavity
Fabrication
|
G. Isoyama
|
PDF
|
2. STF Status Report
|
H. Hayano
|
PDF
|
3. A Report of Cs2Te
cathode evaporation test
|
K. Watanabe
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
29th
Meeting (13 April 2011)
1.
Status of Cavity Fabrication
|
K.Kawase
|
PDF
|
2.
Damage and recovery status of KEK site by the East-Japan Earthquake
|
H.
Hayano
|
|
3.
Minutes
|
M.
Kuriki
|
DOC
|
|
28th
Meeting (10 January 2011)
1.
A Report of Cavity Cleaning
|
H.
Sugiyama
|
PDF
|
2.
Status of Cavity Fabrication |
G.
Isoyama
|
PDF
|
3.
Minutes
|
M.
Kuriki
|
DOC
|
|
27th Meeting (10 January 2011)
1. Status of Cavity
Fabrication
|
G. Isoyama
|
PDF
|
|
26th Meeting (8 December 2010)
1. Status of Cavity
Fabrication
|
T. Kato
|
DOC
|
2. Minutes
|
M. Kuriki
|
DOC
|
|
25th Meeting (26 October 2010)
1. Cavity Surface
Treatment
|
H. Hayano
|
|
2. Minutes
|
M. Kuriki
|
DOC
|
|
24th
Meeting (28 September 2010)
1.
Brazing Update
|
G.Isoyama
|
PDF1, PDF2
|
2.
A report from Q-Beam injector meeting
|
M.
Kuriki
|
PDF
|
3.
Minutes
|
M.
Kuriki
|
DOC
|
|
23th
Meeting (25 August 2010)
|
22th Meeting (20 July 2010)
1. Pick up monitor for the
RF Gun cavity
|
S. Michizono
|
PDF
|
2. Brazing test update
|
G. Isoyama
|
PDF1, PDF2,
PDF3, PDF4, PDF5
|
3. Dry-ice cleaning for
the RF Gun cavity
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
21th Meeting (15 June 2010)
1. Brazing summary
|
G.Isoyama
|
PDF
|
2. Brazing document 1
|
G.Isoyama |
PDF |
3. Brazing document 2
|
G.Isoyama |
PDF |
4. Brazing document 3
|
G.Isoyama |
PDF |
5. Progress of RF Gun
processing
|
Y. Takahashi
|
PPT
|
6. Minutes
|
M. Kuriki
|
DOC
|
|
20th Meeting (14 May 2010)
1. Design Considerations
on the water cooling channel
|
G. Isoyama
|
PDF
|
2. A report of the brazing
test (1)
|
G. Isoyama
|
PDF
|
3. A report of the brazing
test (2)
|
G. Isoyama |
PDF
|
4. Grain boundary on OFC-1
|
G. Isoyama |
PDF
|
5. Progress of the
DESY/FNAL RF Gun cavity aging at STF
|
H. Sugiyama
|
PDF
|
6. Meeting minutes
|
M. Kuriki
|
DOC
|
|
19th Meeting (1 April 2010)
1. Status of L-band RF Gun
cavity
|
G. Isoyama
|
|
2. A status report of the
STF laser installation
|
M. Takano
|
|
3. Discussion on STF
injector R&D
|
M. Kuriki
|
PDF
|
4. Meeting Minutes
|
M. Kuriki
|
DOC
|
|
18th
Meeting (3 March 2010)
1. Status of L-band RF Gun
cavity and Solenoid magnet fabrication
|
S. Kashiwagi
|
PDF
|
2. Preparation for STF
laser installation
|
M. Kuriki
|
PDF
|
3. Meeting Minutes
|
M. Kuriki
|
DOC
|
|
17th
Meeting (27 January 2010)
1. Status of cavity design
and fabrication
|
S. Kashiwagi
|
PDF
|
2. Status of FNAL cavity
|
H. Hayano
|
|
3. Preparation of install
of the laser system to STF
|
M. Kuriki
|
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
Quantum
Beam Hiroshima Meeting (14-15, January 2010)
1. R&D for high
brightness electron sources
|
M. Kuriki
|
PDF
|
2. L-band RF electron gun
|
G. Isoyama
|
PDF
|
|
16th Meeting (15 December 2009)
1. A report of visit at
IAP, Nizhny Novgorod
|
M. Kuriki
|
PDF
|
2. A report of visit at
DESY, Hamburg
|
M. Kuriki
|
PDF
|
3. Status of Cavity design
|
S. Kashiwagi
|
DOC
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
15th Meeting (10 November 2009)
1. STF laser development
status
|
M. Kuriki
|
PDF
|
2. Thermal modeling of
L-band RF Gun (3)
|
S. Kashiwagi
|
PDF
|
3. Mission at IAP
and DESY
|
M. Kuriki
|
PDF
|
4 Minutes
|
M. Kuriki
|
DOC
|
|
14th Meeting (13 October 2009)
1. Thermal modeling of
L-band RF gun (2)
|
G. Isoyama
|
DOC
|
2. Cavity design of L-band
RF Gun
|
S. Kashiwagi
|
PDF
|
3. Possible arrangement of
trip to Russia-Germany
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
13th
Meeting (4 September 2009)
1. Thermal analysis of
L-band RF gun cavtiy
|
G. Isoyama
|
PDF
|
2. Update of estimation of
cooling water
|
G. Isayamo
|
DOC
|
3. Memorandom of CsTe
cathode (3)
|
H. Sugiyama
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
12th Meeting (3 August 2009)
1. A review of RF gun
|
N. Terunuma
|
ZIP
|
2. Status of Cavity
Fabricati
|
S. Kashiwagi
|
PPT
|
3. Laser infrastructure
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
11th Meeting (6 July 2009)
1. A qualitative
consideration on thermionic property of RF Gun cavity
|
G. Isoyama
|
PDF
|
2. Beam line design and
cavity fabrication
|
S. Kashiwagi
|
PDF
|
3. Memorandom of CsTe
cathode (2)
|
H. Sugiyama
|
PPT
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
10th Meeting (8 June 2009)
1. Injector Layout
|
H.Hayano
|
PPT
|
2. Fiber transport of the
drive laser
|
M. Kuriki
|
PDF
|
3. A memorandum of CsTe
cathode system
|
H. Sugiyama
|
PDF
|
4. Inventory list
for CsTe cathode system
|
H. Sugiyama
|
DOC
|
5. STF beamline
|
S. Kashiwagi
|
PPT
|
6. STF beamline (ver2)
|
S. Kashiwagi |
PDF
|
7. L-band cavity thermal
analysis
|
K. Kanbe
|
PPT
|
8. Minutes
|
M. Kuriki
|
DOC
|
|
9th Meeting (24 April 2009)
1. Laser R&D status
|
M. Kuriki
|
PDF
|
2. A report of Cavity
fabrication meeting
|
M. Kuriki |
PDF
|
3. A memorandom for Cavity
tuning
|
S. Kashiwagi
|
PDF
|
3. Minutes
|
M. Kuriki |
DOC
|
|
8th Meeting (24 March 2009)
1. FNAL Meeting Report
|
S. Kashiwagi
|
PDF
|
2. Test cavity status
|
S. Kashiwagi
|
PDF
|
3. Discussion on JFY 09
Plan
|
M. Kuriki
|
PDF
|
4. IAP-JINR-KEK laser
system: Intermediate report(3/26)
|
E. Khazanov
|
PPT
|
5. Meeting minutes
|
M. Kuriki
|
DOC
|
|
7th Meeting (24 February 2009)
1. RF tuning and Solenoid
|
S. Kashiwagi
|
PDF
|
2. Minutes
|
M. Kuriki
|
DOC
|
|
6th Meeting
(13 January 2009)
|
5th Meeting (12 December 2008)
1.
Solenoid
|
S, Kashiwagi
|
PPT
|
2. Design of STF phase-2
accelerator beam line (reference)
|
I.Hwang
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
4th Meeting (10 October 2008)
A report from LINAC 2008
|
G. Isoyama
|
DOC
|
Minutes
|
M. Kuriki
|
DOC
|
|
3rd
Meeting (5 September 2008)
Test Cavity and Coupler
Prototyping
|
S. Kashiwagi
|
PDF
|
Minutes
|
M. Kuriki
|
DOC
|
|
|
1st Meeting
(20 June 2008)
|