High
Brightness Inejector Research Group
|
38th meeting
(18 January 2012)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOCX
|
|
37th meeting
(14 December 2011)
1. Stauts of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF1 PDF2
|
3. Preparation of Gun
Installation to CERL Hall
|
R. Nagai
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOCX
|
|
36th meeting
(16 November 2011)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Field analysis of 500kV
gun
|
K. Miyoshi
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOCX
|
|
35th meeting
(14 September 2011)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Beam property from
Semi-conductor Cathode
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
34th meeting
(1 August 2011)
1. ERL electron gun R&D
strategy
|
M. Kuriki
|
PDF
|
2. Minutes
|
M. Kuriki
|
DOC
|
|
33rd meeting
(17 June 2011)
1. Status of 500kV gun 1st |
M. Yamamoto
|
PDF
|
2. Status of 500kV gun 2nd |
N. Nishimori
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
32nd meeting
(20 May 2011)
1. GaAs preparation for
photo-cathode performance test
|
X.G. Jin
|
PDF
|
2. A report of GaAs cathode
temporal response
|
T. Matsuha
|
PDF
|
3. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
4. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
5. Minutes
|
M. Kuriki
|
DOC
|
|
31th meeting
(18 February 2011)
1.
Status of KEK studies
|
M.
Yamamoto
|
PDF
|
2.
Outgas rate measurement by BeCu Q-mass
|
S.
Hosoda
|
PDF
|
3.
Status of 500kV gun 1st
|
N.
Nishimori
|
PDF
|
4.
Yb fibre laser R&D
|
I.
Ito
|
PDF
|
5.
Status of HUES1
|
D.
Kubo
|
PDF
|
5.
Minutes
|
M.
Kuriki
|
DOC
|
|
30th meeting
(13 January 2011)
1.
Status of KEK studies
|
M.Yamamoto
|
PDF
|
2.
Status of Test Beam Line
|
T.
Matsuba
|
PDF
|
|
29th
meeting (29 November 2010)
1.
Status of 500kV gun 1st
|
N.
Nishimori
|
PDF
|
2.
Status of 500kV gun 2nd
|
M.
Yamamoto
|
PDF
|
3.
Test beam line commissioning
|
T.
Matsuha
|
PDF
|
4.
Status of Fibre laseer R&D
|
I.
Ito
|
PDF
|
5.
Status of HUES1
|
D.
Kubo
|
PDF
|
6.
Minute
|
M.
Kuriki
|
DOC
|
|
28th meeting (18 October 2010)
1. Status of Fibre laser
R&D
|
I.Ito
|
PDF
|
2. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
3. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
27th meeting (6 September 2010)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Status of Fibre laser
R&D
|
I. Ito
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
26th
meeting (4 August 2010)
|
25th meeting (22 July 2010)
1. Status
of 500kV gun 1st
|
N.
Nishimori
|
PDF
|
2. Status
of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Vacuum
test of HUES1
|
D. Kubo
|
PDF
|
4. QE
spectrum of GaAs cathode
|
Y. Masumoto
|
PDF
|
5. Thermal
simulation of cathode
|
H. Iijima
|
PDF
|
6. Minutes
|
M. Kuriki
|
DOC
|
|
24th meeting (21 June 2010)
1. NPES3-AR beam test
|
T. Miyajima
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
23th meeting (17 May 2010)
1. Status of 500kV gun 1st
|
N.Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M.Yamamoto
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
22nd
meeting
(12 April 2010)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
21th
meeting (15 March 2010)
1. Status of 500kV gun 1st
|
N. Nishimori
|
PDF
|
2. Status of 200kV gun and
500kV gun 2nd
|
M. Yamamoto
|
PDF
|
3. RGA by Q-mass analyzer
|
H. Iijima
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
Press
Release (10 March 2010)
A high-voltage dc photocathode electron gun (500kV gun 1st) was
successfully conditioned up to a voltage of
550 kV and a long-time holding test for 8 h was demonstrated at an
acceleration voltage of 500 kV. It is a worldrecord as accelerating
voltage of Photo-cathode DC electron gun.
Press
release : Abstract
|
PDF
|
Press release : Detail
Explaination
|
PDF
|
Nikkan Kogyo Shinbun online
|
Link
|
JAEA home page
|
Link
|
KEK home page
|
Link
|
Hiroshima University home
page
|
Link
|
|
20th
meeting (8 February 2010)
1. Status of 500kV gun 1st
|
N. Nishimori
|
|
2. Status of 500kV gun 2nd
|
Y. Honda (on behalf of M.
Yamamoto)
|
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
19th meeting (28
December 2009)
1. Status
of 500kV gun 1st
|
N.
Nishimori
|
|
2. HV test
of the 500kV gun 1st
|
R. Nagai
|
|
3. Status
of 500kV gun 2nd
|
M. Yamamoto
|
|
4. High
voltage ceramic test
|
Y.Kose
|
|
5. Laser
status of ILCTA
|
Y. Honda
|
|
6.¡¡Cathode
lifetime study
|
H. Iijima
|
|
7. A
proposal of cathode R&D
|
M. Kuwahara
|
|
8. Minutes
|
M. Kuriki
|
DOC
|
|
18th meeting (5
November 2009)
1. Status of JERL Gun the 1st |
N. Nishimori
|
PDF
|
2. Status of JERL Gun the
2nd and 200kV gun
|
M. Yamamoto
|
PDF
|
3. A Discussion on face-face
meeting for cERL gun R&D
|
H. Kawata
|
PPT
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
17th
meeting (6 October 2009)
1. Status
of JERL Gun the 1st
|
N.
Nishimori
|
PDF
|
2. A study
of GaAs cathode lifetime
|
C. Shonaka
|
PDF
|
3. Gas
desorption rate from ceramic samples
|
M. Yamamoto
|
PDF
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
16th
meeting (4 September 2009)
1. Status of HUES1
|
D. Kubo
|
PDF
|
2. A report from FEL09
|
N. Nishimori
|
|
3. A design status of JERL
Gun the second
|
M. Yamamoto
|
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
15th
meeting (5 August 2009)
1. A new cathode test system
in Hiroshima University
|
D. Kubo
|
PDF
|
2. Dark-lifetime degradation
by elevated temperature
|
C. Shonaka
|
PDF
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
14th meeting (29 June 2009)
1. 500kV
gun status
|
N. Nishimori
|
PDF
|
2. A report from ERL09
|
M. Yamamoto
|
|
3. Minutes
|
M. Kuriki
|
DOC
|
|
13th meeting (25 May 2009)
1. Thermal
effects on lifetime of GaAs cathode
|
C. Shonaka
|
PDF
|
2. Status of 500kV Gun no. 1
|
N. Nishimori
|
PDF
|
3. A report of 200kV gun
transfer and design of 500kV gun no. 2
|
M.Yamamoto
|
PDF
|
4. Meeting minutes
|
M. Kuriki
|
DOC
|
|
12th meeting (27 April 2009)
1. A
Proposal for ERL Photo-cathode
|
M. Kuwahara
|
PDF
|
2. 500kV gun status
|
N. Nishimori
|
PDF
|
3. CERL Cathode electrode
design
|
M. Yamammoto
|
PDF
|
4. 250kV gun status
|
H. Iijima
|
PDF
|
5.Meeting minutes
|
M. Kuriki
|
DOC
|
|
11th meeting (23
March 2009)
1. 200kV gun emittance
mesurement
|
T. Konomi
|
PDF
|
2. 250kV gun status
|
H. Iijima
|
PDF
|
3. 500kV gun status
|
N. Nishimori
|
PDF
|
4. Meeting minutes
|
M.Kuriki
|
DOC
|
|
10th
meeting (23 February
2009)
1. A memorandom of cathode
design
|
M. Yamamoto
|
PDF
|
2. A memorandom of 200keV
gun transfer
|
M. Yamamoto |
PDF
|
3. Schedule of 500kV gun
cathode preparation chamber
|
N. Nishimori
|
PDF
|
4. A status of emittance
measurement of NPES3
|
T. Konomi
|
PDF
|
5. A status of KEK ILCTA
|
Y. Honda
|
PDF
|
6. A status report from HU
|
C. Shonaka
|
PDF
|
7. Meeting minutes
|
M. Kuriki
|
DOC
|
|
Hiroshima University High Brightness Injector Development
Meeting (10th meeting)
2009/1/22-23
at Hiroshima University Graduate school of Advanced Sciences of Matter
(ADSM)
Meeting Home page is here.
|
9th meeting (16 December 2008)
1.
500kV gun status
|
N.
Nishimori
|
PDF
|
2.
A
proposal of Electron Gun Test Facility
|
Y.
Honda
|
PDF
|
3.
Long Life Cathode R&D
|
M.
Kuriki
|
PDF
|
4.
Hiroshima University status report
|
C.
Shonaka
|
PDF
|
5.
Emittance measurement on NPES3
|
T.
Konomi
|
PDF
|
6.
Minutes
|
M.
Kuriki
|
DOC
|
|
8th meeting (04
November 2008)
1. Puck design for high
power and high availability operation
|
M. Yamamoto
|
PDF
|
2. 15mm diameter puck design
|
N. Nishimori
|
PDF
|
3. Hiroshima univesity
status report
|
C. Shonaka
|
PPT
|
4. Minutes
|
M. Kuriki
|
DOC
|
|
7th
meeting (6 October 2008)
1. Status report from
Hiroshima University
|
M. Kuriki
|
PDF
|
2. PESP2008 report and
discussion
|
N. Nishimori
|
PDF
|
5. PESP2008 Ceramic
|
M. Yamamoto
|
PDF
|
5. Minutes
|
M. Kuriki
|
DOC
|
|
6th
meeting (1 September 2008)
1. Status report from
Hiroshima university
|
M. Kuriki
|
PDF
|
2. A design of ceremic
insulator for 500kV gun (2)
|
T. Muto
|
PDF
|
3. 500kV gun components
|
N. Nishimori
|
PDF
|
4. Minutes
|
M. Kuriki
|
Doc
|
|
5th meeting
(6 August 2008)
1. 500kV Gun Conceptual
Design
|
R. Hajima
|
PDF
|
2. Suggestions to 500kV Gun
R&D from experiences of 200kV gun
|
M. Yamamoto
|
PDF
|
3. Issues on 500kV Gun
R&D
|
M. Kuriki
|
PDF
|
4. Minutes
|
M. Kuriki
|
Doc
|
|
4th meeting
(28 July 2008)
1. A design of ceremic
insulator for 500kV gun
|
T. Muto
|
PPT
|
2. A proposal of 500kV gun
development schedule
|
R. Hajima
|
PPT
|
3. Life time measurement of
NPES3
|
T. Konomi
|
PDF
|
4. Out gas rate measurement
|
M. Yamamoto
|
PDF
|
5. Status of Test bench at
Hiroshima
|
C. Shonaka
|
PDF
|
6. Minutes
|
M. Kuriki
|
DOC
|
|
3rd meeting (23 June 2008)
1. TiN coating system
|
Y. Honda, T. Muto |
PDF
|
2. 250kV gun status
|
R. Hajima |
PDF
|
3. Issues to be disscussed
|
M. Kuriki |
PDF
|
4. Minutes |
M. Kuriki
|
PDF
|
|
2nd meeting
(19 May 2008)
- Life time
qualification with 200kV gun (T.
Konomi)
PDF
- Outgas
qualification system (M.
Yamamoto)
PDF
- Devices and
equipments for 500kV gun R&D (JAEA-ERL) PPT
- Surface
analysis status and plan (M.
Kuriki)
PPT
- Minutes
DOC
|
1st High
Brightness Injector Development Team meeting (9 April 2008)
- Status report by M. Kuriki PDF
- Minutes
PDF
|
ERL Study Group Meeting (12
April 2007)
-
An action
plan of laser development for ERL by M. Kuriki – PDF.
|
ERL
Injector Study Group Meeting (13 July 2006)
- Status of JAEA ERL Gun development by T. Nishitani and H.
Iijima (JAEA) - PDF.
- Boundary conditions among the injector developments at
KEK by M. Kuriki (KEK) - PDF.
- A proposal for Laser development for ERL/STF by H.
Tomizawa (Sp8) - PDF.
- Minutes
of the meeting is coming soon.
|
Old
materials
- ERL report (electron gun) PDF
- ERL report slides PDF
- ERL PF conference abstract PDF
- ERL R&D PDF
- ERL gun status PDF
- Laser R&D (LAAA 01) PDF
|