High Brightness Inejector Research Group

38th meeting (18 January 2012)


1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Minutes
M. Kuriki
DOCX

37th meeting (14 December 2011)


1. Stauts of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF1 PDF2
3. Preparation of Gun Installation to CERL Hall
R. Nagai
PDF
4. Minutes
M. Kuriki
DOCX

36th meeting (16 November 2011)


1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Field analysis of 500kV gun
K. Miyoshi
PDF
4. Minutes
M. Kuriki
DOCX

35th meeting (14 September 2011)


1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Beam property from Semi-conductor Cathode
M. Kuriki
PDF
4. Minutes
M. Kuriki
DOC

34th meeting (1 August 2011)


1. ERL electron gun R&D strategy
M. Kuriki
PDF
2. Minutes
M. Kuriki
DOC

33rd meeting (17 June 2011)

1. Status of 500kV gun 1st M. Yamamoto
PDF
2. Status of 500kV gun 2nd N. Nishimori
PDF
3. Minutes
M. Kuriki
DOC

32nd meeting (20 May 2011)


1. GaAs preparation for photo-cathode performance test
X.G. Jin
PDF
2. A report of GaAs cathode temporal response
T. Matsuha
PDF
3. Status of 500kV gun 2nd
M. Yamamoto
PDF
4. Status of 500kV gun 1st
N. Nishimori
PDF
5. Minutes
M. Kuriki
DOC

31th meeting (18 February 2011)

1. Status of KEK studies
M. Yamamoto
PDF
2. Outgas rate measurement by BeCu Q-mass
S. Hosoda
PDF
3. Status of 500kV gun 1st
N. Nishimori
PDF
4. Yb fibre laser R&D
I. Ito
PDF
5. Status of HUES1
D. Kubo
PDF
5. Minutes
M. Kuriki
DOC

30th meeting (13 January 2011)


1. Status of KEK studies
M.Yamamoto
PDF
2. Status of Test Beam Line
T. Matsuba
PDF

29th meeting (29 November 2010)

1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Test beam line commissioning
T. Matsuha
PDF
4. Status of Fibre laseer R&D
I. Ito
PDF
5. Status of HUES1
D. Kubo
PDF
6. Minute
M. Kuriki
DOC

28th meeting (18 October 2010)


1. Status of Fibre laser R&D
I.Ito
PDF
2. Status of 500kV gun 1st
N. Nishimori
PDF
3. Status of 500kV gun 2nd
M. Yamamoto
PDF
4. Minutes
M. Kuriki
DOC

27th meeting (6 September 2010)

1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Status of Fibre laser R&D
I. Ito
PDF
4. Minutes
M. Kuriki
DOC

26th meeting (4 August 2010)



1. Minutes
M. Kuriki
DOC

25th meeting (22 July 2010)

1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Vacuum test of HUES1
D. Kubo
PDF
4. QE spectrum of GaAs cathode
Y. Masumoto
PDF
5. Thermal simulation of cathode
H. Iijima
PDF
6. Minutes
M. Kuriki
DOC

24th meeting (21 June 2010)

1. NPES3-AR beam test
T. Miyajima
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Status of 500kV gun 1st
N. Nishimori
PDF
4. Minutes
M. Kuriki
DOC

23th meeting (17 May 2010)

1. Status of 500kV gun 1st
N.Nishimori
PDF
2. Status of 500kV gun 2nd
M.Yamamoto
PDF
3. Minutes
M. Kuriki
DOC

22nd meeting (12 April 2010)

1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 500kV gun 2nd
M. Yamamoto
PDF
3. Minutes
M. Kuriki
DOC

21th meeting (15 March 2010)


1. Status of 500kV gun 1st
N. Nishimori
PDF
2. Status of 200kV gun and 500kV gun 2nd
M. Yamamoto
PDF
3. RGA by Q-mass analyzer
H. Iijima
PDF
3. Minutes
M. Kuriki
DOC

Press Release (10 March 2010)


A high-voltage dc photocathode electron gun (500kV gun 1st) was successfully conditioned up to a voltage of
550 kV and a long-time holding test for 8 h was demonstrated at an acceleration voltage of 500 kV. It is a worldrecord as accelerating voltage of Photo-cathode DC electron gun.

Press release : Abstract
PDF
Press release : Detail Explaination
PDF
Nikkan Kogyo Shinbun online
Link
JAEA home page
Link
KEK home page
Link
Hiroshima University home page
Link

20th meeting (8 February 2010)


1. Status of 500kV gun 1st
N. Nishimori

2. Status of 500kV gun 2nd
Y. Honda (on behalf of M. Yamamoto)

3. Minutes
M. Kuriki
DOC

19th meeting (28 December 2009)


1. Status of 500kV gun 1st
N. Nishimori

2. HV test of the 500kV gun 1st
R. Nagai

3. Status of 500kV gun 2nd
M. Yamamoto

4. High voltage ceramic test
Y.Kose

5. Laser status of ILCTA
Y. Honda

6.¡¡Cathode lifetime study
H. Iijima

7. A proposal of cathode R&D
M. Kuwahara

8. Minutes
M. Kuriki
DOC

18th meeting (5 November 2009)


1. Status of JERL Gun the 1st N. Nishimori
PDF
2. Status of JERL Gun the 2nd and 200kV gun
M. Yamamoto
PDF
3. A Discussion on face-face meeting  for  cERL gun  R&D
H. Kawata
PPT
4. Minutes
M. Kuriki
DOC

17th meeting (6 October 2009)

1. Status of JERL Gun the 1st
N. Nishimori
PDF
2. A study of GaAs cathode lifetime
C. Shonaka
PDF
3. Gas desorption rate from ceramic samples
M. Yamamoto
PDF
4. Minutes
M. Kuriki
DOC

16th meeting (4 September 2009)


1. Status of HUES1
D. Kubo
PDF
2. A report from FEL09
N. Nishimori

3. A design status of JERL Gun the second
M. Yamamoto

4. Minutes
M. Kuriki
DOC

15th meeting (5 August 2009)

1. A new cathode test system in Hiroshima University
D. Kubo
PDF
2. Dark-lifetime degradation by elevated temperature
C. Shonaka
PDF
3. Minutes
M. Kuriki
DOC

14th meeting (29 June 2009)


1. 500kV gun status
N. Nishimori
PDF
2. A report from ERL09
M. Yamamoto

3. Minutes
M. Kuriki
DOC

13th meeting (25 May 2009)

1. Thermal effects on lifetime of GaAs cathode
C. Shonaka
PDF
2. Status of 500kV Gun no. 1
N. Nishimori
PDF
3. A report of 200kV gun transfer and design of 500kV gun no. 2
M.Yamamoto
PDF
4. Meeting minutes
M. Kuriki
DOC

12th meeting (27 April 2009)


1. A Proposal for ERL Photo-cathode
M. Kuwahara
PDF
2. 500kV gun status
N. Nishimori
PDF
3. CERL Cathode electrode design
M. Yamammoto
PDF
4. 250kV gun status
H. Iijima
PDF
5.Meeting minutes
M. Kuriki
DOC

11th meeting (23 March 2009)


1. 200kV gun emittance mesurement
T. Konomi
PDF
2. 250kV gun status
H. Iijima
PDF
3. 500kV gun status
N. Nishimori
PDF
4. Meeting minutes
M.Kuriki
DOC

10th meeting (23 February 2009)

1. A memorandom of cathode design
M. Yamamoto
PDF
2. A memorandom of 200keV gun transfer
M. Yamamoto PDF
3. Schedule of 500kV gun cathode preparation chamber
N. Nishimori
PDF
4. A status of emittance measurement of NPES3
T. Konomi
PDF
5. A status of KEK ILCTA
Y. Honda
PDF
6. A status report from HU
C. Shonaka
PDF
7. Meeting minutes
M. Kuriki
DOC

Hiroshima University High Brightness Injector Development Meeting (10th meeting)

2009/1/22-23
at Hiroshima University Graduate school of Advanced Sciences of Matter (ADSM)

Meeting Home page is here.
 

9th meeting (16 December 2008)

1. 500kV gun status
N. Nishimori
PDF
2. A proposal of Electron Gun Test Facility
Y. Honda
PDF
3. Long Life Cathode R&D
M. Kuriki
PDF
4. Hiroshima University status report
C. Shonaka
PDF
5.  Emittance measurement on NPES3
T. Konomi
PDF
6. Minutes
M. Kuriki
DOC

8th meeting (04 November 2008)

1. Puck design for high power and high availability operation
M. Yamamoto
PDF
2. 15mm diameter puck design
N. Nishimori
PDF
3. Hiroshima univesity status report
C. Shonaka
PPT
4. Minutes
M. Kuriki
DOC

7th meeting (6 October 2008)

1. Status report from Hiroshima University
M. Kuriki
PDF
2. PESP2008 report and discussion
N. Nishimori
PDF
5. PESP2008 Ceramic
M. Yamamoto
PDF
5. Minutes
M. Kuriki
DOC

6th meeting (1 September 2008)

1. Status report from Hiroshima university
M. Kuriki
PDF
2. A design of ceremic  insulator for 500kV gun (2)
T. Muto
PDF
3. 500kV gun components
N. Nishimori
PDF
4. Minutes
M. Kuriki
Doc

5th meeting (6 August 2008)

1. 500kV Gun Conceptual Design
R. Hajima
PDF
2. Suggestions to 500kV Gun R&D from experiences of 200kV gun
M. Yamamoto
PDF
3. Issues on 500kV Gun R&D
M. Kuriki
PDF
4. Minutes
M. Kuriki
Doc

4th meeting (28 July 2008)

1. A design of ceremic  insulator for 500kV gun
T. Muto
PPT
2. A proposal of 500kV gun development schedule
R. Hajima
PPT
3. Life time measurement of NPES3
T. Konomi
PDF
4. Out gas rate measurement
M. Yamamoto
PDF
5. Status of Test bench at Hiroshima
C. Shonaka
PDF
6. Minutes
M. Kuriki
DOC

3rd meeting (23 June 2008)

1. TiN coating system
Y. Honda, T. Muto PDF
2. 250kV gun status
R. Hajima PDF
3. Issues to be disscussed
M. Kuriki PDF
4. Minutes M. Kuriki
PDF

2nd meeting (19 May 2008)

  1. Life time qualification with 200kV gun (T. Konomi)                  PDF
  2. Outgas qualification system   (M. Yamamoto)                        PDF
  3. Devices and equipments for 500kV gun R&D  (JAEA-ERL) PPT
  4. Surface analysis status and plan  (M. Kuriki)                           PPT
  5. Minutes                                                                                         DOC

1st High Brightness Injector Development Team meeting (9 April 2008)

  1. Status report by M. Kuriki  PDF
  2. Minutes                              PDF

ERL Study Group Meeting (12 April 2007)

  1. An action plan of laser development for ERL by M. Kuriki – PDF.

ERL Injector Study Group Meeting (13 July 2006)

  1. Status of JAEA ERL Gun development by T. Nishitani and H. Iijima (JAEA)  - PDF.
  2. Boundary conditions among the injector developments at KEK by M. Kuriki (KEK)  -  PDF.
  3. A proposal for Laser development for ERL/STF by H. Tomizawa (Sp8) - PDF.
  4. Minutes of the meeting is coming soon.

Old materials

  1. ERL report (electron gun) PDF
  2. ERL report slides PDF
  3. ERL PF conference abstract PDF
  4. ERL R&D PDF
  5. ERL gun status PDF
  6. Laser R&D (LAAA 01) PDF

mkuriki@hiroshima-u.ac.jp

 Revised 21-Feb-2012